The written report — how we document care
If it isn’t written down, it didn’t happen.
Every assessment ends in a written report: what we found on your property, what we’ll do about it, and written pricing — before you decide anything. The report is yours to keep, whoever you hire.
Exterior Condition Assessment
20-point walkthrough · written report within 24 hours
Property: —
City: —
Assessed by: —
| Pt | Zone | What we found | What we’ll do |
|---|---|---|---|
| 01 | Roof — north face | Organic growth, moderate | Soft wash, treat at source |
| 04 | Gutter exterior — street side | Oxidation run-off streaking | Clear and flush |
| 06 | Siding — west elevation | Mildew film, light | Soft wash, house chemistry |
| 11 | Driveway approach | Surface staining, tire marks | Pre-treat, surface clean |
| 13 | Rust at hose bib | In the material — will lighten, not vanish | Stain-specific treatment, honest expectations |
| 16 | Plant beds, both sides | Healthy, exposed to overspray | Pre-soak, cover, neutralize, rinse |
+ written pricing per line · no same-day decision asked for
Point 12 is the part most companies skip: some marks are in the material — permanent staining, oxidation, rust pitting, etching. We tell you which is which before we start, not after. That honesty is the reason the report exists.
Read closely
Every surface is read before anything is applied.
A roof, a driveway and an array, up close. The notes point at what is actually in each photograph — nothing here is cleaned up or enhanced.

Start at the cap
Every drop the ridge cap catches gets dumped on the course directly beneath it. That is why the darkening runs as a heavy band under the cap line and thins out as you work down the plane — read the cap first and the rest of the roof explains itself.
The lap line holds the water
Each course sits over the one below, and that overlap stays wet long after the dew has burned off the open face. Growth almost always shows up as a line along the laps before it ever spreads across a tile.
On the tile, not in it
This is growth sitting on the surface, not staining driven into the concrete. The right mix at low pressure releases it and leaves the aggregate where it is. Turn the pressure up instead and you take the face of the tile off with the algae.

This is what one pass removes.
One photo, taken partway through a patio job. The concrete on one side of the line has been cleaned once. The other side is exactly how we found it. We take these mid-job shots because they show the difference without needing a before and an after.
AfterPhotographed honestly — no staging, no saturation tricks, no “enhance.” What you see is the surface as we found it and as we left it.
Straight cuts from the camera roll — real speed, real color, no music. The same honesty rule as the photographs.
The assessment is free. The report is yours to keep. Whoever you hire.
We’ll personally follow up within 1–2 business days.
